Developing and realizing wind power projects in Germany

ENACOM supports wind power projects from the initial site idea through to readiness for construction and transaction. Market analysis, securing land, BImSchG procedures, contract management and approaching investors from a single source.

Why ENACOM as a partner for wind power projects in Germany

Over 850 accompanied energy projects, 15 years of project development experience and active wind power projects in Brandenburg, Saxony-Anhalt and other federal states. ENACOM knows the German wind market from its own experience.
0
Years of entrepreneurial experience
0
Accompanied energy projects
0
Years of project development
0
Years of renewable energies
Wind turbines from the air at sunrise - Have the area for wind power checked

Who ENACOM’s wind power development is suitable for

ENACOM develops wind power projects for landowners and agricultural companies who want to use their land for wind energy in the long term, for municipalities with designated wind priority areas and for investors and operators who are specifically looking for wind power projects that are ready for approval or have been developed. We accompany the entire development process from initial assessment to handover.
Landowners with suitable open spaces of 1 ha or more in wind priority areas
Municipalities with an active land use plan or designated wind areas
Investors and operators in search of developable locations
Project developers who need capacity for approval or transaction

What ENACOM does for wind power development

We accompany wind power projects through all development phases: GIS-supported site analysis, securing land through lease agreements, complete BImSchG procedure including expert coordination and communication with authorities, contract management and transaction preparation. Each phase from a single source, with a dedicated contact person.
GIS-supported site analysis and feasibility check
Lease agreements, easements and grid connection agreements
Complete BImSchG procedure up to the legally binding decision
Project evaluation and transaction preparation for investors
Wind turbines in coastal landscapes in Germany as a symbol for project development and site assessment

How ENACOM develops wind power projects

From the initial site idea to building maturity. Structured, transparent and with clear milestones.

Location and securing space

We analyze potential wind sites using GIS, check planning law, protected areas and technical feasibility and secure suitable areas through long-term lease agreements.

BImSchG procedure and approval

ENACOM takes care of the entire approval process: Scoping appointment, application, noise and shadow impact assessments, avifaunistic assessments and communication with the authorities through to the official decision.

Readiness for construction and transaction

Once approval has been granted, we prepare the project for construction and, if required, accompany the transaction to the investor or operator with full documentation.

Frequently asked questions about wind power development with ENACOM

Answers to the most important questions about location requirements, approval procedures and cooperation.
A modern wind turbine requires an open area of at least one to two hectares directly at the turbine site. Additional land is required for development, access roads and safety distances. More important than the size alone is the location in a designated wind priority area or in a zone without hard exclusion criteria. ENACOM checks suitability free of charge.
A wind power project in Germany typically takes six to ten years from the initial securing of land to commissioning. The BImSchG approval procedure accounts for the largest share of the time, at two to four years. The construction phase itself takes six to twelve months.
The lease depends on the location, turbine size and wind conditions. Annual leases of between 30,000 and 80,000 euros per turbine or a profit-related share are common. ENACOM negotiates conditions in line with the market and ensures transparent contractual conditions without hidden clauses.
Our focus is on eastern Germany: Brandenburg, Saxony-Anhalt, Saxony, Thuringia and Mecklenburg-Western Pomerania. We also develop in other federal states and across borders in Slovakia. We can check the suitability of sites throughout Germany free of charge.
If a wind power project fails to obtain approval, owners and leaseholders do not incur any costs. ENACOM assumes the development risk. Together, we examine whether alternative turbine types, site variants or other forms of use are possible.
Yes, repowering is a growing focus. We support the approval of new, more powerful turbines at existing locations, including the adaptation of lease agreements, grid connections and the approval process. The development time for existing turbines can often be significantly shortened.

Develop wind power project or offer area

Whether you are an owner wishing to offer a site for wind power, an investor looking for a wind power location or a developer in need of capacities for approval or transactions. ENACOM is your partner for the entire development process.